PPAP Checklist Generator
IATF 16949 PPAP submission level checklist. Track completion status and generate a submission summary.
PPAP Submission Level
Level 3: PSW with samples and complete supporting data (default level).
Completion
0%
Done
0
Pending
18
N/A
0
18 PPAP Elements
Before a new part is submitted for customer approval, the PPAP team must confirm all 18 elements (per AIAG PPAP 4th edition) are complete and meet the required submission level. This tool tracks the completion status of each document and calculates submission progress in real time, avoiding production launch delays caused by missing items. PPAP approval is typically the prerequisite for production authorization (PSW, Part Submission Warrant); an incomplete PPAP blocks the supplier from production release and impacts the entire supply chain.
Tracking 18 PPAP elements (submission Level 3): Completed (12/18): - Design records (drawings) ✓ - Dimensional report (100% measured) ✓ - Material / performance test results ✓ - Initial process study (Cpk ≥ 1.67) ✓ - MSA study (Gage R&R) ✓ Pending (6/18): - PPAP design record sign-off ✗ (awaiting customer engineer approval) - First article samples (2 pcs) ✗ (awaiting engineering confirmation) → Estimated completion: 67%; 5 business days needed for remaining items
FAQ
Related Tools
Control Plan
The Control Plan is one of the 18 PPAP elements and the most important quality document; confirming its completion is a key step in PPAP submission.
Open toolFailure Mode & Effect Analysis
FMEA is a required PPAP element; the FMEA must be complete and high-RPN risk items addressed before entering the PPAP submission process.
Open toolProcess Capability Index
PPAP requires initial process studies to reach Cpk ≥ 1.67; use this calculator to verify pre-production process capability meets customer requirements.